This project required the replacement of a faulty flow monitor for a new Client approved transducer and associated transmitter. Work undertaken included:
-
Liaison with Clients operational team to plan a shutdown for time to replace the faulty monitoring equipment.
-
Upfront electrical design and off site build of the new transmitter enclosure.
-
New cable and containment.
-
Removal of the faulty transmitter and installation of the new.
-
New off site telemetry configuration.
-
Commissioning of the new instrument and associated close down documentation.
-
Clients operator training.