featured project
The great work we did
We were tasked by our client to scope and design an upgraded pump solution to achieve a higher pass forward flow. Our scope included:
-
On site investigation followed by electrical design.
-
Modification to existing MCC starter section.
-
Installation and integration of a new 132Kw VSD.
-
Installation of upgraded SWA cable and containment.
-
Adjustments to existing PLC software to incorporate the new VSD and flow control.
-
On site commissioning and close out documentation.